Skip to content

Previous / implemented (work)

Previous

Previous

Work in progress

Work in progress

Earthen bridge works for the project of the Monorail train (Ain Sokhna Section) at the distance from 54+500 to 57+852 with a length of 3.352 km

Awarding Body ( General Authority for Roads and Bridges )

Earthen bridge works for the project of the Monorail train (Ain Sokhna Section) at the distance from 7+500 to 8+000 with a length of 0.5km

Awarding Body ( General Authority for Roads and Bridges )

Suez Canal Rd pavement (Right lane)

Awarding Body ( Dakahlia Governorate, Roads and transportation directorate )

Suez Canal Rd pavement (Left lane)

Private Projects

The High Speed Electric Train Project (Ain Sokhna Sector) with a length of 3.352 km

Awarding Body ( General Authority for Roads and Bridges )

Expansion and development of Wadi El-Natrun El-Alamein Road

Awarding Body ( General Authority for Roads and Bridges )

Ganaklis Desert Road Duplication Project

Awarding Body ( General Authority for Roads and Bridges )

The electric express train project (an alternative road to the quarry road)

Awarding Body ( General Authority for Roads and Bridges )

Al Fardan-Salhiya Road Development and Duplication Project

Awarding Body ( General Authority for Roads and Bridges )

Pauline Aqueduct Road Project

Awarding Body ( General Authority for Roads and Bridges )
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.